Deliverables

Ref Code Deliverable title and description
D-10 WWW FRM4SOC web portal to be operated and updated for the duration of the Contract
D-20 BRO-1 Initial FRM4SOC Project Brochure in PDF format
D-30 BRO-2 Final FRM4SOC Project Brochure in PDF format and 200 printed copies required for distribution prior to the workshop
D-40 FIG High quality graphics (FIG) that can be used by the FRM4SOC project and ESA to promote the outcomes of the project throughout the project
D-50 WEBS Web Stories for the FRM4SOC web site describing the interesting and innovative activities of the FRM4SOC project (2 per year)
D-60 TR-1 Technical Report: “Measurement Requirements and Protocols when Operating Fiducial Reference Measurement (FRM) Ocean Colour Radiometers (OCR) for Satellite Validation”
D-70 TR-2 Technical Report: “A Review of Commonly used Fiducial Reference Measurement (FRM) Ocean Colour Radiometers (OCR) used for Satellite OCR Validation”
D-80 TR-3 Technical Report: “Protocols and Procedures to Verify the Performance of Reference Irradiance and Radiance Sources used to by Fiducial Reference Measurement (FRM) Ocean Colour Radiometers (OCR) for Satellite Validation”
D-90 LCE-1-IP LCE-1 implementation plan
D-100 LCE-1 Following TR-3, implement a round-robin LCE to verify the performance of reference radiance and irradiance sources (ie. lamps, plaques etc.) used to maintain the calibration of FRM OCR radiometers traceable to SI
D-110 LCE-1- DATA Data package containing all data collected during LCE-1
D-120 TR-4 Technical Report: “Results from the First FRM4SOC Reference Radiance and Irradiance Source Verification Laboratory Calibration Experiment Campaign”
D-130 TR-5 Technical Report: “Protocols and Procedures to Verify the Performance of Fiducial Reference Measurement (FRM) Field Ocean Colour Radiometers (OCR) used for Satellite Validation”
D-140 LCE-2-IP LCE-2 implementation plan
D-150 LCE-2 Following TR-5 implement a round-robin LCE campaign to verify the performance of FRM OCR used for Satellite Validation traceable to SI
D-160 LCE-2- DATA Data package containing all data collected during LCE-2
D-170 TR-6 Technical Report “Results from the First FRM4SOC Field Ocean Colour Radiometer Verification Round Robin Campaign”
D-180 TR-7 Technical Report ”Uncertainty Budgets of FRM4SOC Fiducial Reference Measurement (FRM) Ocean Colour Radiometer (OCR) systems used to Validate Satellite OCR products”
D-190 TR-8 Technical Report “Protocols and Procedures for Field Inter-Comparisons of Fiducial Reference Measurement (FRM) Field Ocean Colour Radiometers (OCR) used for Satellite Validation”
D-200 FICE-IP Implementation plan for the FRM4SOC field inter-comparison experiments (FICE)
D-210 FICE-DB Field inter-comparison experiment database (FICE-DB)
D-220 TR-9 Technical Report “Results from the First FRM4SOC Field Inter-Comparison Experiment (FICE) of Ocean Colour Radiometers”
D-230 WKP-1 International workshop “Options future infrastructure required for the long-term vicarious adjustment of the Sentinel-3 OLCI and Sentinel-2 MSI A/B/C and D instruments”
D-240 PROC-1 D-240 Proceedings of WKP-1 (PROC-1) Report of the international workshop
D-250 TR-10 Technical Report “Requirements and recommendations for infrastructure required for the long-term vicarious adjustment of the Sentinel-3 OLCI and Sentinel-2 MSI A/B/C and D instruments”
D-260 WKP-2 FRM4SOC final workshop
D-270 PROC-2 FRM4SOC workshop proceedings (this may take the form of a journal special issue)
D-280 SOR FRM4SOC Scientific and Operational Roadmap
D-290 TDP Technical Data Package
D-300 FR FRM4SOC Final Report
D-310 PMP Project Management Plan and Schedule
D-320 MR Executive  monthly  progress  report  and actions database (may be part of the MR)
D-330 CCS Contract Closure Summary