Statement of Work

FRM4SOC Statement of Work

Date: 8th December 2015, Issue 1 Rev 6 FINAL

Table of Contents

1 Introduction

1.1 Structure of This Document

2 Applicable and reference documents

2.1 Applicable documents
2.2 Reference Documents (RD)
2.3 Universal Resource Locators (URL)
2.4 Acronyms and Abbreviations

3 Scientific Background to the FRM4SOC project

3.1 Sentinel-3 Ocean and Land Colour Imager (OLCI)
3.2 Sentinel-2 Multi Spectral Instrument (MSI)
3.3 The FRM4SOC Project
3.3.1 The Importance of Uncertainty Budgets
3.4 Action required

4 Scope of the FRM4SOC Project
5 Description of the work

5.1 Work Logic
5.2 Task 1: Communication, Outreach and Promotion
5.3 Task 2: OCR FRM Description, Measurement Procedures and Protocols
5.4 Task 3: SI-traceable Laboratory inter-comparison experiment for FRM OCR
and reference irradiance/radiance calibration targets
5.4.1 Task 3.1: Verification of reference irradiance and radiance sources
5.4.2 Task 3.2: Verification of FRM OCR
5.4.3 Task 3.3: Uncertainty Budgets for FRM OCR
5.5 Task 4: OC FRM Field Inter-Comparison Experiments
5.6 Task 5: Options and approaches to the long-term vicarious adjustment of
Sentinel- OLCI & MSI A/B/C and D instruments
5.6.1 Task 6: Final Workshop and Reporting

6 Management, Reporting, Meetings and Deliverables

6.1 Management
6.1.1 General
6.1.2 Communications
6.2 Access
6.3 Reporting
6.3.1 Minutes of Meeting
6.3.2 Project Management Plan and Bar-chart Schedule
6.3.3 Progress Reports
6.3.4 Problem Notification
6.3.5 Technical Documentation
6.4 Meetings
6.5 Deliverable Items
6.5.1 FRM4SOC Deliverables list

7 Schedule and Milestones

7.1 Duration
7.2 Milestones