Ref |
Code |
Deliverable title and description |
D-10 |
WWW |
FRM4SOC web portal to be operated and updated for the duration of the Contract |
D-20 |
BRO-1 |
Initial FRM4SOC Project Brochure in PDF format |
D-30 |
BRO-2 |
Final FRM4SOC Project Brochure in PDF format and 200 printed copies required for distribution prior to the workshop |
D-40 |
FIG |
High quality graphics (FIG) that can be used by the FRM4SOC project and ESA to promote the outcomes of the project throughout the project
Available at the password protected Partner Sharepoint Area |
D-50 |
WEBS |
Web Stories for the FRM4SOC web site describing the interesting and innovative activities of the FRM4SOC project (2 per year) |
D-60 |
TR-1 |
Technical Report: “Measurement Requirements and Protocols when Operating Fiducial Reference Measurement (FRM) Ocean Colour Radiometers (OCR) for Satellite Validation”
Published as:
K. Ruddick et. al., “A Review of Protocols for Fiducial Reference Measurements of Water-Leaving Radiance for Validation of Satellite Remote-Sensing Data over Water”, Remote Sens. 2019, 11(19), 2198; https://doi.org/10.3390/rs11192198
K. Ruddick et. al., “A Review of Protocols for Fiducial Reference Measurements of Downwelling Irradiance for the Validation of Satellite Remote Sensing Data over Water”, Remote Sens. 2019, 11(15), 1742; https://doi.org/10.3390/rs11151742 |
D-70 |
TR-2 |
Technical Report: “A Review of Commonly used Fiducial Reference Measurement (FRM) Ocean Colour Radiometers (OCR) used for Satellite OCR Validation” |
D-80 |
TR-3a |
D-80a: Technical Report TR-3a “Protocols and Procedures to Verify the Performance of Reference Irradiance Sources used by Fiducial Reference Measurement Ocean Colour Radiometers for Satellite Validation” |
|
TR-3b |
D-80b Technical Report TR-3b “Protocols and Procedures to Verify the Performance of Reference Radiance Sources used by Fiducial Reference Measurement Ocean Colour Radiometers for Satellite Validation” |
D-90 |
LCE-1-IP |
LCE-1 implementation plan |
D-100 |
LCE-1 |
Białek, A.; Goodman, T.; Woolliams, E.; Brachmann, J.F.S.; Schwarzmaier, T.; Kuusk, J.; Ansko, I.; Vabson, V.; Lau, I.C.; MacLellan, C.; et al. Results from Verification of Reference Irradiance and Radiance Sources Laboratory Calibration Experiment Campaign. Remote Sens. 2020, 12, 2220. https://doi.org/10.3390/rs12142220 |
D-110 |
LCE-1- DATA |
Data package containing all data collected during LCE-1
Available at the password protected Partner Sharepoint Area |
D-120 |
TR-4 |
Technical Report: “Results from the First FRM4SOC Reference Radiance and Irradiance Source Verification Laboratory Calibration Experiment Campaign”
Białek, A.; Goodman, T.; Woolliams, E.; Brachmann, J.F.S.; Schwarzmaier, T.; Kuusk, J.; Ansko, I.; Vabson, V.; Lau, I.C.; MacLellan, C.; et al. Results from Verification of Reference Irradiance and Radiance Sources Laboratory Calibration Experiment Campaign. Remote Sens. 2020, 12, 2220. https://doi.org/10.3390/rs12142220 |
D-130 |
TR-5 |
Technical Report: “Protocols and Procedures to Verify the Performance of Fiducial Reference Measurement (FRM) Field Ocean Colour Radiometers (OCR) used for Satellite Validation” |
D-140 |
LCE-2-IP |
LCE-2 implementation plan |
D-150 |
LCE-2 |
Following TR-5 implement a round-robin LCE campaign to verify the performance of FRM OCR used for Satellite Validation traceable to SI
V. Vabson, et. al., “Laboratory Intercomparison of Radiometers Used for Satellite Validation in the 400–900 nm Range”,
Remote Sens. 2019,11(9),1101; https://doi.org/10.3390/rs11091101
V. Vabson, et. al., “Field Intercomparison of Radiometers Used for Satellite Validation in the 400–900 nm Range”,
Remote Sens. 2019, 11(9), 1129; https://doi.org/10.3390/rs11091129 |
D-160 |
LCE-2- DATA |
Data package containing all data collected during LCE-2
Available at the password protected Partner Sharepoint Area |
D-170 |
TR-6 |
Technical Report “Results from the First FRM4SOC Field Ocean Colour Radiometer Verification Round Robin Campaign”
Published as:
V. Vabson, et. al., “Laboratory Intercomparison of Radiometers Used for Satellite Validation in the 400–900 nm Range”,
Remote Sens. 2019,11(9),1101; https://doi.org/10.3390/rs11091101
V. Vabson, et. al., “Field Intercomparison of Radiometers Used for Satellite Validation in the 400–900 nm Range”,
Remote Sens. 2019, 11(9), 1129; https://doi.org/10.3390/rs11091129 |
D-180 |
TR-7 |
Technical Report ”Uncertainty Budgets of FRM4SOC Fiducial Reference Measurement (FRM) Ocean Colour Radiometer (OCR) systems used to Validate Satellite OCR products”
Published as:
Białek, A.; Douglas, S.; Kuusk, J.; Ansko, I.; Vabson, V.; Vendt, R.; Casal, A.T. Example of Monte Carlo Method Uncertainty Evaluation for Above-Water Ocean Colour Radiometry. Remote Sens. 2020, 12, 780. |
D-190 |
TR-8 |
Technical Report “Protocols and Procedures for Field Inter-Comparisons of Fiducial Reference Measurement (FRM) Field Ocean Colour Radiometers (OCR) used for Satellite Validation” |
D-200 |
FICE-IP |
Implementation plan for the FRM4SOC field inter-comparison experiments (FICE) |
D-210 |
FICE-DB |
Field inter-comparison experiment database (FICE-DB)
Available at the password protected Partner Sharepoint Area |
D-220 |
TR-9 |
Technical Report “Results from the First FRM4SOC Field Inter-Comparison Experiment (FICE) of Ocean Colour Radiometers”
Published as:
Tilstone, G.; Dall’Olmo, G.; Hieronymi, M.; Ruddick, K.; Beck, M.; Ligi, M.; Costa, M.; D’Alimonte, D.; Vellucci, V.; Vansteenwegen, D.; Bracher, A.; Wiegmann, S.; Kuusk, J.; Vabson, V.; Ansko, I.; Vendt, R.; Donlon, C.; Casal, T. Field Intercomparison of Radiometer Measurements for Ocean Colour Validation. Remote Sens. 2020, 12, 1587.
Alikas, K.; Vabson, V.; Ansko, I.; Tilstone, G.H.; Dall’Olmo, G.; Nencioli, F.; Vendt, R.; Donlon, C.; Casal, T. Comparison of Above-Water Seabird and TriOS Radiometers Along an Atlantic Meridional Transect. Remote Sens. 2020, 12, 1669 |
D-230 |
WKP-1 |
International workshop “Options future infrastructure required for the long-term vicarious adjustment of the Sentinel-3 OLCI and Sentinel-2 MSI A/B/C and D instruments” |
D-240 |
PROC-1 |
D-240 Proceedings of WKP-1 (PROC-1) Report of the international workshop |
D-250 |
TR-10 |
Technical Report “Requirements and recommendations for infrastructure required for the long-term vicarious adjustment of the Sentinel-3 OLCI and Sentinel-2 MSI A/B/C and D instruments” |
D-260 |
WKP-2 |
FRM4SOC final workshop |
D-270 |
PROC-2 |
FRM4SOC workshop proceedings
|
D-280 |
SOR |
FRM4SOC Scientific and Operational Roadmap |
D-290 |
FR |
FRM4SOC Final Report |
D-310 |
PMP |
Project Management Plan and Schedule |
D-320 |
MR |
Executive monthly progress report and actions database (may be part of the MR) |
D-330 |
CCS |
Contract Closure Summary |